The “Assets” section: a map with a tipper’s track, DVR video and the timeline

Product tour: assets, video wall, tracking, reports and checkpoints on real screens.

Product overview
The Smart Gate checkpoint wall

Smart Gate: the barrier opens by number plate, and the checkpoint keeps working without the internet.

How it works

Plans, limits and retention

What a plan limits and how long tracks, metrics and passages are kept.

In all apps 3 min read

All the numbers that limit your work are collected here: how much equipment a plan allows, how long data is kept and what limits apply to reports, video and uploads.

Plans

Plans differ only in the number of cameras and devices. Every section and feature is in every plan, and you can add as many employees as you like.

PlanCamerasDevices and DVRsPer month
Start2 cameras1 device1,490 ₽
Business10 cameras5 devices4,900 ₽
Corporateunlimitedunlimited12,900 ₽
  • A limit restricts adding only. Equipment that is already registered is never switched off, even if there is more of it than the plan allows.
  • When the limit is reached, the web app will not let you add a new camera or device and will say why.
  • The plan does not limit assets, geofences, buildings, checkpoints or passes.
  • The plan can be changed on request, from the next billing month. More on the Pricing page and in Plan and payment.

How long data is kept

DataPeriod
Device tracks, geofence events, connection history90 days
Camera availability checks (charts and SLA in Analytics)30 days
The checkpoint passage log with frames90 days; frames of denials 30 days, while the record itself stays
The retranslator event log30 days
Passages under WIM stations, the alert lognot deleted by age
Video from cameras and DVRsnot recorded

Records older than their period are deleted automatically once a day. The server does not record video at all: a recording is kept on the camera or the DVR itself, if it is turned on there. Points from a device’s memory that are older than the track retention period are not kept when the device uploads them.

Reports

  • One report is built from no more than 600,000 track points. If there are more points, the web app asks you to narrow the period or the number of devices.
  • The report period is limited by the track retention period, that is, 90 days.
  • The “Trace” table shows up to 5,000 points on the screen, thinned out, while CSV exports the full series of up to 50,000 rows.
  • A chart shows up to 1,500 points per device.

Video

  • Up to four DVRs can be on at once on the video wall: each takes up its vehicle’s mobile connection.
  • In a checkpoint card, live video comes from the first four cameras; the rest are listed under the video.
  • DVR video plays only while someone is watching: leaving the page or hiding the tab frees the vehicle’s connection.

Other limits

WhatLimit
Vertices of a geofence500
A floor planPNG, JPEG or WebP, up to 12 MB
Importing passes from a fileup to 5,000 rows at a time
Resending a past period through a retranslatorup to 31 days at a time
The log of passages under WIM stations in one requestup to 365 days
Signing in to the Android app and the Telegram panel10 attempts an hour from one username or address
Address suggestions300 requests an hour per employee
Alerts per houras many as set in the Alerts section; 0 means no limit

See also

Found a mistake, or didn’t find an answer? Write to us on Telegram or send us a request, and we will reply and fix the article.

We will show it on your equipment

Tell us about your task, and we will show Panopticum on your cameras and vehicles

Or start on your own: after sign-up you get 14 days of the “Business” plan free, no card needed.

  • We reply during working hours, fastest on Telegram
  • We will help you connect cameras and devices remotely
  • Only you and your staff see your data
What are you interested in